Xinjiang steel structure project contracting and construction must follow strict processes and standards. First, carry out pre-construction preparations, including detailed review of design drawings, formulation of construction plans, organization of training for construction personnel, and preparation of required materials and equipment. During the construction process, it is necessary to ensure that all operations comply with relevant safety regulations, and construction is carried out in strict accordance with the design drawings. At the same time, on-site management is strengthened to ensure project progress and quality.
As for the inspection methods, it mainly includes inspection of the size, shape, position and connection method of steel structure components. Xinjiang steel structure manufacturers say that they can use various methods such as visual inspection, measurement and non-destructive testing to ensure the installation accuracy and overall stability of steel structure projects. At the same time, strict inspection of key parts such as welding quality and anti-corrosion coating is required to ensure that the project meets design requirements and quality standards.
You can choose airless high-pressure spraying, manual brushing or air spraying. In order to ensure the thickness of the paint film on welding, corners, sharp edges and other parts, Xinjiang Steel Structure Engineering Contractor pre-coats with paint before carrying out large-area painting.
During painting, the operator should measure the wet film thickness with a wet film thickness gauge at any time. When painting, you should use the vertical and horizontal painting method of first up and down and then left and right, or first left and right and then up and down, to make the paint film smooth, smooth and even in thickness. Xinjiang Xinjiang Steel Structure Manufacturer said that the surface treatment quality is checked according to the color photos in the GB8923-88 standard. Check the surface condition of the paint film with the naked eye. The paint film should be free of pinholes, bubbles, cracks, peeling, sags, missed coatings and other defects. Use a paint film thickness gauge to measure the dry film thickness. The thickness of the paint film should be measured after each coat. The total thickness of the paint film must be measured after the painting is completed. One point is measured every 1-3 square meters (or otherwise specified). The thickness of more than 90% of the measured points must reach the specified value. The thickness of the film that does not reach the specified value shall not be less than 90% of the specified value. Otherwise, it should be re-coated or an additional coat should be applied.
For the anti-corrosion of Xinjiang’s steel structures and pipelines’ temperature-resistant parts, the steel structure companies should use corresponding high-temperature anti-corrosion primers, topcoats and silicone-modified and inorganic-modified high-temperature coatings. Before painting, the steel surface needs to be sandblasted, shot blasted, oiled and rust removed before the primer and topcoat can be applied.

Advantages of Xinjiang steel structure engineering: Seismic resistance: Most of the roofs of low-rise villas are sloped roofs, so the roof structure basically uses a triangular roof truss system made of cold-formed steel components. After sealing the structural plates and gypsum boards, the light steel components form a very strong "rib structure system". This structural system has stronger earthquake resistance and resistance to horizontal loads, and is suitable for areas with a seismic intensity of above 8 degrees. Xinjiang steel structure buildings are light in weight, high in strength, good in overall rigidity and strong in deformation ability.
The building's self-weight is only one-fifth of that of a brick-concrete structure, and it can withstand hurricane force winds of 70 meters per second, allowing life and property to be effectively protected. The light steel structure residential structure is all composed of cold-formed thin-walled steel component systems. The steel frames are made of super anti-corrosion high-strength cold-rolled galvanized sheets, which effectively avoids the impact of corrosion of steel sheets during construction and use, increases the service life of light steel components, and the structural life can reach 100 years.
The thermal insulation material selected is mainly fiberglass wool, which has excellent thermal insulation effect. The insulation board used in the exterior wall can effectively prevent the "cold bridge" phenomenon of the wall and achieve better thermal insulation effect. The thermal resistance value of R15 insulation cotton about 100mm thick can be equivalent to that of a 1m thick brick wall. Xinjiang Steel Structure Project Contractors all use high-efficiency and energy-saving walls, which have good thermal insulation, heat insulation, and sound insulation effects, and can reach 50% energy-saving standards.